Everything you should know before you build — materials, timeline, and cost estimator.
Estimate Your Construction Cost
Enter the area in sq.ft to see your estimated construction cost
Which Material Is Right For You?
Red Brick / AAC Block
Reliability and Strong homes
CSEB Blocks
Cooler homes
Rammed Earth
Cooler homes with luxury construction
MIVAN
Speed & modern builds
Red Brick / AAC
Reliable, widely available, and resale-friendly.
CSEB
Lower heat, eco-friendly, cooler interiors.
Rammed Earth
Unique aesthetics, natural thermal comfort, premium feel.
MIVAN
Speed, modern structure, aluminium formwork.
What Happens Week By Week
Foundation
- Excavation
- PCC
- Footing & columns
Structure
- Brickwork
- Lintel
- Roof slab
Finishing
- Plastering
- Flooring
- Electrical & plumbing
Final Work
- Painting
- Fixtures
- Cleaning & handover
1 Floor
~2 months
2 Floors
~4 months
3 Floors
~6 months
Construction Payment Plan
Stage-based payments ensure transparency, quality control, and smooth progress. You pay only for completed milestones.
Mobilization (Project Initiation)
Site clearance, marking, earthwork, PCC, centering, steel reinforcement, and foundation up to plinth beam.
Up to Plinth Level
Brickwork from ground level to plinth level and soil refilling.
Ground Floor Structure
Substructure work including DPC, brickwork, precast rafter making, lintel and roof beam centering, and reinforced concrete roofing.
First Floor Work
Wall leveling, brickwork, precast rafter making, lintel and roof beam construction, reinforced concrete, and ground floor plastering.
Plastering & Finishing Base
Wall leveling, brickwork, internal plastering, external plaster with cement wash, and terrace finishing.
Carpentry & Flooring
Woodwork including frame installation, polishing, fixing, slab work, and flooring (stone/cement).
Roof & Structural Metal Work
Metal roof fabrication, staircase work, and pooja room construction.
Utilities & Final Installations
Entrance steps, utility steps, electrical wiring, and plumbing pipelines.
Project Completion & Handover
Final completion and handover.
Total: 100% — Stage-Based Payment Model
Build With Vaastu
Traditional wisdom for harmonious living — direction placements, colors, and remedies for every room.
Entrance
Kitchen
Bathroom
Plants
West Zone
Master Bedroom
Kids Activities
Study Table
Kids Room
North Direction
Sleeping Direction
Creativity
Pooja Place
Bedrooms by Profession
- arrow_rightService employee → North
- arrow_rightSales → West
- arrow_rightActors → South
- arrow_rightBusinessmen → West
Bathroom Direction Indicator
- arrow_rightBlue → North
- arrow_rightGreen → East
- arrow_rightRed → South
- arrow_rightWhite → West
Kitchen (Non-Vaastu Remedy)
- healingKeep green leaf below stove or use yellow color
Direction Colors
- arrow_rightSouth → Baby pink, Orange, Yellow (Avoid Black)
- arrow_rightSouth East / South West → Avoid Blue
- arrow_rightEast → Green, Brown, Beige
- arrow_rightWest → White, Yellow
Couple Bedroom
Decision Making
Animal Symbols Placement
- arrow_rightLion, Elephant, Horse → South
- arrow_rightLion → South or East
Religious Placement
- arrow_rightHanuman (Sanjeevani) → North or North East
- arrow_rightDevi Ma → South or East (Avoid blue & black colors)
Land Selection
- arrow_rightFacing sea → East, West, North (Avoid South)
- arrow_rightTall buildings → West or South (Avoid East/North)
- arrow_rightAvoid corner plots
Build It Right
The First Time
An informed client always gets a better home. Talk to us — we'll explain everything clearly.